top of page

CV

Mac Abueideh
 

Vancouver, BC

Canada

 

E-mail: m.abueideh@outlook.com

Phone: 778-883-5842

  • LinkedIn Social Icon
Professional info​

Performance-driven Civil Engineer with experience working on large scale projects with strict deadlines, ensuring top quality work and customer service. Able to identify and quantify cost factors, such as production time and raw material, equipment, and labor expenses, collaborating with engineers, architects, owners, and contractors to compile and calculate estimates. Extensive educational qualifications including my Bachelor of Science in Civil Engineering from the University of Windsor, combined with my Associate Certificate in Construction Operations, Six Sigma Green Belt and Inspector Level II certifications. Experienced working in many phases of construction and in customer orientated atmospheres, able to perform crisis management and foster customer loyalty delivering projects on time, under budget while exceeding client expectations

Work experience
Languages

English

Arabic

Skills

AutoCAd

Robot Structural Analysis

MATLAP
Microsoft Office

Project Manager, Estimator.
Poycrete Restorations Ltd. Coquitlam, BC

​Aug 2015 - Current

 

  • Responsible for gathering proposals, blueprints, specifications, and related documents for current and upcoming projects.

  • Conduct site assessment visit to gather specifications and create initial product/supplies lists prior to project estimation.

  • Accurately compute cost by analyzing labour, material, and time requirements, delivering findings to project managers in a timely manner.

  • Present prepared estimate by assembling and displaying numerical and descriptive information, actingas a Subject Matter Expert for business units and clients to help them understand cost breakdown.

  • Leverage strong background to write numerous proposals.

 
Field Engineer Intern.
Flatiron Construction Corp. Mission, BC

​Sep 2014 - Dec 2014

 

Worked on Ruskin Dam Upgrade project as a field engineer 

  • Assisted with project submittals, submittal acquisition, and review incoming submittal prior to sending to the owner 

  • Reviewed project specifications and confer with Project Manager and Project Engineer concerning project requirements; such as plan preparation, acceptance testing, evaluation of of field conditions, design changes, and reports 

  • Performed concrete quantity “cut-off” calculations and concrete testing at the time of concrete placement 

  • Managed procurement and delivery of permanent materials and storage on the project site 

  • Performed daily site inspections to monitor the progress and confirm with the drawings  Supervised on installing and stressing post tension bars on the dam 

 

Cost Engineer Intern.
Peter Kiewit Energy Canada. Calgary, AB

​Jan 2014 - May 2014

 

Worked on Kearl Oil Sand Froth Treatment in project control department 

  • Created cost codes 

  • Prepared daily, weekly, and monthly external reports 

  • Built performance factor graphs 

  • Adjusted contracts and claimed quantities 

  • Prepared labor distribution report 

 

Civil Engineer Intern.
Read Jones Christoffersen Engineering Consultant. Vancouver, BC

​May 2013 - Sep 2013

 

  • Performed site field review that included locating delamination concrete, rebar Inspection, review the installation of membrane coating system, and performed post tension cables condition assessment 

  • Prepared bid documents for new projects 

  • Estimated site work scope of work 

  • Reviewed contractor invoices 

  • Distributed Certificate for Payment documentatio

 
Site Foreman/ Lead Hand.
Vector Group Ltd. Vancouver, BC

​Sep 2008 - Sep 2012

 

Recruited to work as a labor to replace post tension cables in high-rise buildings, and I worked my way up to become a site foreman/lead hand within four months.

Selected Achievements :

  • Supervised a staff of 12 people 

  • Coordinated with external consultants and managers to ease the job progress 

  • Lead hand on the biggest post tension replacement job in North America for 2009 

  • Safety Officer for the BC Division 

  • Recommended appropriate construction methods 

  • Supported site supervision by preparing daily schedule

 

Pipe layer and Ashphalt layer.
AKS Trenchless. Vancouver, BC

​Oct 2007 - July 2008

 

Established knowledge in road foundation work from laying pipes, reading maps, and surveying to asphalt work.

Selected Achievements :

  • ​ Worked on installing the central water, sanitary, fire hydrant lines in 80 townhouses complex project

  • Worked on installing central water tanks, manholes for other projects

  • Operated asphalt paving machine for a couple of small projects

Education​
University of Windsor
Honors Bachelor of Civil Engineering
2011 - 2015

 

Britich Columbia institute of Technology
Associate Certificate of Construction Operation

​209 - 2011

 

Post Tension Institute
Certificate of Unbonded Post Tension Level Two (Inspector)

​2015-2018

 

Manufacturing Engineering Solutions
Six Sigma green belt

​2015

 

Extra-curricular activities
  • Ground penteration radar training
  • Myers-briggs training level one and two
  • Confined space training
  • WHIMS training
Professional membership
  • Association of professional engineers and geoscientists of BC( EIT )
  • Post-tensioning institute
bottom of page